Remodeling your
has never been easier!

Eano works with top-rated professional in San Francisco Bay area to provide kitchen & bathroom remodeling ADU's and more

Check out average renovation cost of our past projects
sqft.
Input phone number to unlock the cost
$15,000
By submitting, I agree to Eano Terms of Service
Save 40% of your cost
Flooring: $3 - $5 / sqft
ADU: $200 - $350 / sqft
Bathroom / Kitchen: $12,000 - $30,000
2X Faster
Flooring: 1 week
Bathroom / Kitchen: 2 - 3 months
ADU: 4 - 5 months
Our Service
Bathroom
Kitchen
ADU
Flooring
Complete Package
Don't know how to pick your renovation style or materials? We’ve partnered with the industry’s top architects and contractors to create remodeling packages specifically for your needs.
Project Showcase
Check out the cost of the project we recently completed in your neighborhood and find inspirations for your own remodeling project.
Eano Partnered Stores
Take a virtual tour of our incredible partner stores. We take social distancing seriously, so we’ve visited and scanned these stores to save you a trip.
WHAT HAPPENS NEXT?
EANO focuses on operation excellence to maximize delight during a traditionally painful process.
1
Virtual Estimate 🤖
Send us photos and video of your space. Tell us about your goals. We’ll give you a proposal with projected timelines and a scope of work.
Your personal project manager and the dedicated Eano design team will meet with you to go over details and your overall vision.
We’ll measure your space, get building approvals, provide detailed drawings, set up pre-renovation home protection and deliver materials.
That’s it! Your project will be built reliably and efficiently by a qualified local contractor, rigorously vetted. Get ready for your new renovation!
The #1 rated renovation company in America!
Eano scored unanimous 5-star rating on
reviews.
Commonly Asked Questions
What responsibilities will you handle and which will Eano handle?
Eano responsibilities: We will handle the labor, rough materials, debris removal. Our PM @Michael will provide you a material package, so you don't need to find out what you need and struggle with different specs at the same time. If you want to pick other materials, you can coordinate with our PM and order the right size. HOMEOWNER responsibilities: needs to purchase all the finishing materials and our project manager will help you to verify the usability before purchasing it.
Most of the mistake happens: 1. When the materials are the wrong size (back and forth ship and delivery time) 2. Missing some purchase materials and homeowners rush to buy it during the construction. 3. Installation detail miscommunication ( ex: an electric toilet cover vs a normal toilet) 4. Construction imperfection and need to redo. To prevent these problems, we will go through all the material list with you and verify all the details with you as much as possible BEFORE we start the work. By doing all the preparation work right, this will save you on avg 30% of the entire construction time and budget.
The contractor will be onsite. For small details or change orders, you will leave a note in the chat group or a spreadsheet or speak with our contractor directly on the site. This is the most efficient way to handle the problem. If the problem doesn’t get resolved, Michael will follow up with the contractors. Our PM can meet on the site every week in person, but we do charge an additional $1500 or 3% (whichever is higher) for the premium service.
From our past experience, it will always be some small things come up here and there. we can't promise during the construction it will always be a 100% pleasant experience. However, you have our project manager to communicate with you and handle all the unexpected things. The price we gave you is corresponding to the work scope details that you and the contractor/Sales discussed in person. We will try our best to put everything in the contract and make sure it’s trackable for you and us. However, things might slip out the contract but if it's not against common sense, we will cover them at no cost. 1. For example Window installation. Even though Window Screen installation hasn't been written into the contract. If the owner decides to install a window with us, then installing a window screen should be a default at no charge. 2. For example Bathroom remodel. Our contractor and the homeowner are not aware of the water damages. Our construction team open the wall and found out all rotten wood underneath. Homeowner wants to replace all the wood and depends on the condition, if the work will take more than a few hours to fix it, we will start charging based on each condition. Eano promises that the price is always going to match with the market rate.
If the homeowner would like the option to reduce the scope of work if deemed necessary. Upon 2 weeks written notice, if the entire project hasn’t started, says the entire bathroom or guest bathroom hasn’t been touched and the homeowner doesn’t want to do that bathroom. Then we will reduce the entire bit for that bathroom. If our construction team has already started the project, the homeowner decides not to add a van. a partial project in the bathroom, then we won’t deduct the labor price for that van installation. I want to claim that we are not a traditional contractor company. We are a young startup that's trying to build a reputable brand that provides an all-inclusive and secure solution for our users. If you have more questions, please feel free to send them over to support@redfinovation.com . More common questions will be added to the list which also benefit other homeowners too.
Service Areas
Bay Area
San Francisco
San Jose
Los Angeles
Vancouver
Contact Form
We’re here to help!
Remodeling simplified.